BWBL Field Construction, Day 22

September 13, 2012

Today brought dirt - a LOT of dirt (a shade over 65 tons of infield mix)!  Delivery began early (around 7:30 am), but was finished by 10 am.  Early on, some of the mix was placed along the first base side, and later in the day, a good portion of the main infield was given a starter layer.  Once a roller can be purchased (heading to Stroudsburg tomorrow morning for the right sized one), it can be compacted, with more layers to be added.

Work began around 7 am, with a break from about 9 am to 5 pm, continuing from 5 pm to 8 pm.

Thanks to Matthew Morgan for the big hand today with delivery, as well as my Mom and Dad for helping to get a good amount of the dirt set up!

This weekend has a lot of opportunity for work, especially Saturday, so if you are available, stop on by and lend a hand!